[1]
2024. Increased On-Time In-Full orders rate in a mass-consumption warehouse by applying Lean Warehouse tools: A case Study. LACCEI. 1, 8 (Apr. 2024). DOI:https://doi.org/10.18687/LACCEI2023.1.1.117.