Optimization of Drilling and Blasting Processes through Mathematical Models to Increase Productivity in the SE Cutting Nv. 1680-Tingo Mine, Compañía Minera Poderosa S.A.-Pataz-Peru, 2022. (2024). LACCEI, 1(8). https://doi.org/10.18687/LACCEI2023.1.1.469