Optimization of Drilling and Blasting Processes through Mathematical Models to Increase Productivity in the SE Cutting Nv. 1680-Tingo Mine, Compañía Minera Poderosa S.A.-Pataz-Peru, 2022. LACCEI, [S. l.], v. 1, n. 8, 2024. DOI: 10.18687/LACCEI2023.1.1.469. Disponível em: https://ojs-laccei.2230.com.ar/index.php/laccei/article/view/2917. Acesso em: 13 dec. 2025.