“Improvement at the Operation and Planning Level in the Electrical Workshop of a Mining Machinery Component Repair Center Using Forecast Methods and Lean Manufacturing Tools”. 2024. LACCEI 1 (8). https://doi.org/10.18687/LACCEI2023.1.1.1353.