“Improvement at the Operation and Planning Level in the Electrical Workshop of a Mining Machinery Component Repair Center using Forecast Methods and Lean Manufacturing Tools” (2024) LACCEI, 1(8). doi:10.18687/LACCEI2023.1.1.1353.