[1]
“Increased On-Time In-Full orders rate in a mass-consumption warehouse by applying Lean Warehouse tools: A case Study”, LACCEI, vol. 1, no. 8, Apr. 2024, doi: 10.18687/LACCEI2023.1.1.117.