“Increased On-Time In-Full Orders Rate in a Mass-Consumption Warehouse by Applying Lean Warehouse Tools: A Case Study”. LACCEI, vol. 1, no. 8, Apr. 2024, https://doi.org/10.18687/LACCEI2023.1.1.117.